Skip to contentSkip to contentSkip to contentSkip to contentSkip to contentSkip to contentDepartment of Human Services, State Government of Victoria
Design Guidelines for Hospitals and Day Procedure Centres (DGHDP)
Skip to contentSkip to content
Skip to contentSkip to content

Victorian Government Website (Victoria The Place To Be)
  Search

Home
Guidelines
Contributors
Schedule
Contacts
Links


Standard Components

Note: These Room Layouts are indicative plan layouts and elevations illustrating an example of good design. The Room Layouts shown are deemed to satisfy these Guidelines. Alternative layouts and innovative planning shall be deemed to comply with these Guidelines provided that the following criteria are met:

  • Compliance with the text of these Guidelines
  • Minimum floor areas as shown in the schedule of accommodation
  • Additional 2 M2 added for each additional door above the minimum required number
  • Heights and dimensions where shown
  • Any Clean/ Dirty separations shown or implied
  • Accessibility to and around various objects as shown or implied
  • Relative location and empirical dimensions of:
  1. Hand rails and Grab rails
  2. Call points, Power, Light Switch, Data and Gas outlets
  3. Bed Screens
  4. Sanitary Fixtures
Part B- Health Facility Briefing and Planning Room Data
Sheet (RDS)
Room Layout
Sheet (RLS)
Sample
Picture
Standard Components pdf (799 kb- PDF) pdf (25.8 mb- PDF)  
1 1 Bed Room (Inboard Ensuite) pdf (31 kb- PDF) pdf (248kb- PDF) film (38 kb, JPG)
  1 Bed Room (Outboard Ensuite) pdf (31 kb- PDF) pdf (249kb- PDF)  
  1 Bed Room (Shared Ensuite) pdf (31 kb- PDF) pdf (249kb- PDF)  
  1 Bed Room-Critical Care pdf (32 kb- PDF) pdf (262kb- PDF)  
  1 Bed Bay-Critical Care pdf (32 kb- PDF) pdf (244kb- PDF)  
  1 Bed Room-Isolation (standard) pdf (31 kb- PDF) pdf (249kb- PDF)  
  1 Bed Room-Isolation (Positive Pressure) pdf (31 kb- PDF) pdf (249kb- PDF)  
  1 Bed Room-Isolation (Negative Pressure) pdf (31 kb- PDF) pdf (395kb- PDF)  
  1 Bed Room-Mental Health (Back to Back Ensuite) pdf (28 kb- PDF) pdf (186kb- PDF)  
  1 Bed Room-Mental Health (Shared Ensuite) pdf (28 kb- PDF) pdf (467kb- PDF)  
  1 Bed Room-Mental Health (Inboard Ensuite) pdf (28 kb- PDF) pdf (185kb- PDF)  
  1 Bed Room-Special pdf (32kb- PDF) pdf (247kb- PDF)  
  1 Bed Room-Special CCU pdf (31kb- PDF) pdf (264kb- PDF)  
    (RDS) (RLS) Picture
2 2 Bed Room (Inboard Ensuite) pdf (31kb- PDF) pdf (421kb- PDF) film (75 kb, JPG)
  2 Bed Room (Outboard Ensuite) pdf (31kb- PDF) pdf (414kb- PDF)  
  2 Bed Room (Shared Ensuite) pdf (31kb- PDF) pdf (421kb- PDF)  
  2 Bed Room-Mental Health (Back to Back ensuite) pdf (28kb- PDF) pdf (502kb- PDF)  
  2 Bed Room-Mental Health (Inboard Ensuite) pdf (28kb- PDF) pdf (332kb- PDF)  
4 4 Bed Room (Inboard Ensuite) pdf (31kb- PDF) pdf (453kb- PDF)  
  4 Bed Room (Outboard Ensuite) pdf (31kb- PDF) pdf (443kb- PDF)  
  4 Bed Room (Inboard/Outboard Ensuite) pdf (31kb- PDF) pdf (502kb- PDF)  
A ADL Bathroom pdf (31kb- PDF) pdf (200kb- PDF)  
  ADL Kitchen pdf (31kb- PDF) pdf (358kb- PDF)  
  ADL Laundry pdf (29kb- PDF) pdf (172kb- PDF)  
  Anaesthetic Induction Room pdf (31kb- PDF) pdf (243kb- PDF)  
  Anteroom pdf (29kb- PDF) pdf (169kb- PDF)  
    (RDS) (RLS) Picture
B Bathroom pdf (32kb- PDF) pdf (217kb- PDF)  
  Bay-Beverage pdf (29kb- PDF) pdf (160kb- PDF)  
  Bay-Flowers (2 & 5 m2) pdf (28kb- PDF) pdf (194kb- PDF)  
  Bay-Handwashing pdf (28kb- PDF) pdf (425kb- PDF)  
  Bay-Linen pdf (28kb- PDF) pdf (149kb- PDF)  
  Bay-Mobile Equipment pdf (26kb- PDF) pdf (148kb- PDF)  
  Bay-Personal Protective Equipment pdf (26kb- PDF) pdf (142kb- PDF)  
  Bay-Resuscitation Trolley pdf (26kb- PDF) pdf (154 kb- PDF)  
  Birthing Room-LDR pdf (31kb- PDF) pdf (413kb- PDF)  
C Catheter Laboratory pdf (31kb- PDF) pdf (365kb- PDF)  
  Catheter Laboratory Control-Reporting Room pdf (29kb- PDF) pdf (202kb- PDF)  
  Change Cubicle-Patient pdf (28kb- PDF) pdf (177kb- PDF)  
  Change Room-Staff pdf (30kb- PDF) pdf (187kb- PDF)  
  Cleaner's Room pdf (28kb- PDF) pdf (166kb- PDF)  
  Clean-Up Room pdf (29kb- PDF) pdf (195kb- PDF)  
    (RDS) (RLS) Picture
  Clean Utility (12 & 14 m2) pdf (31kb- PDF) pdf (451kb- PDF) film (37 kb, JPG)
  Clean Utility-Sub pdf (31kb- PDF) pdf (198kb- PDF)  
  Consult Room pdf (31kb- PDF) pdf (219kb- PDF)  
D Dental Surgery pdf (31kb- PDF) pdf (230kb- PDF)  
  Dirty Utility (10, 12 & 14 m2) pdf (31kb- PDF) pdf (578kb- PDF) film (45 kb, JPG)
  Dirty Utility-Sub pdf (31kb- PDF) pdf (193kb- PDF)  
  Disposal Room pdf (28kb- PDF) pdf (154kb- PDF)  
E Ensuite (Inboard) pdf (31kb- PDF) pdf (206kb- PDF)  
  Ensuite (Inboard-Alternate Option) pdf (31kb- PDF) pdf (207kb- PDF)  
  Ensuite (Outboard) pdf (31kb- PDF) pdf (208kb- PDF)  
  Ensuite (Shared) pdf (31kb- PDF) pdf (199kb- PDF)  
  Ensuite (Shared-Alternate Option) pdf (31kb- PDF) pdf (201kb- PDF)  
  Ensuite (Special) pdf (31kb- PDF) pdf (199kb- PDF)  
  Ensuite-Mental Health pdf (31kb- PDF) pdf (177kb- PDF)  
    (RDS) (RLS) Picture
  Ensuite-Mental Health (Shared) pdf (31kb- PDF) pdf (186kb- PDF)  
  Ensuite-Mental Health (Inboard) pdf (31kb- PDF) pdf (184kb- PDF)  
  Ensuite-Mental Health (Inboard-Alternate Option) pdf (31kb- PDF) pdf (185kb- PDF)  
F Formula Room pdf (29kb- PDF) pdf (185kb- PDF)  
G Gymnasium pdf (31kb- PDF) pdf (345kb- PDF)  
I Interview Room (Clean Office Policy) pdf (28kb- PDF) pdf (183kb- PDF)  
  Interview Room (Family/Large pdf (28kb- PDF) pdf (175kb- PDF)  
L Lounge-Patient pdf (28kb- PDF) pdf (204kb- PDF)  
M Meeting Room-Small (9 & 12 m2) pdf (29kb- PDF) pdf (190kb- PDF)  
  Meeting Room-Medium/Large (15,20,25 & 30 m2) pdf (29kb- PDF) pdf (325kb- PDF)  
N Neonatal Bay-General Care pdf (28kb- PDF) pdf (156kb- PDF)  
  Neonatal Bay-Intensive Care pdf (31kb- PDF) pdf (218kb- PDF)  
  Neonatal Bay-Special Care pdf (31kb- PDF) pdf (189kb- PDF)  
    (RDS) (RLS) Picture
O Office-2 Person Shared pdf (28kb- PDF) pdf (210kb- PDF)  
  Office-3 Person Shared pdf (28kb- PDF) pdf (221kb- PDF)  
  Office-4 Person Shared pdf (28kb- PDF) pdf (225kb- PDF)  
  Office-CEO pdf (28kb- PDF) pdf (185kb- PDF)  
  Office-Clinical/Handover pdf (28kb- PDF) pdf (186kb- PDF)  
  Office-Consult pdf (31kb- PDF) pdf (223kb- PDF)  
  Office-Single Person 9m2 pdf (26kb- PDF) pdf (189kb- PDF)  
  Office-Single Person 12 m2 pdf (26kb- PDF) pdf (189kb- PDF)  
  Office-Workstation Typical pdf (25kb- PDF) pdf (162kb- PDF)  
  Office-Write-up Bay pdf (26kb- PDF) pdf (151kb- PDF)  
  Operating Room-General pdf (32kb- PDF) pdf (478kb- PDF) film (70 kb, JPG)
  Operating Room-Large pdf (32kb- PDF) pdf (473kb- PDF)  
  Operating Room-Minor pdf (32kb- PDF) pdf (463kb- PDF) film (51 kb, JPG)
  Overnight Stay-Bedroom pdf (26kb- PDF) pdf (177kb- PDF)  
  Overnight Stay-Ensuite pdf (28kb- PDF) pdf (169kb- PDF)  
    (RDS) (RLS) Picture
P Pantry pdf (29kb- PDF) pdf (181kb- PDF)  
  Patient Bay-Holding pdf (31kb- PDF) pdf (172kb- PDF)  
  Patient Bay-Trauma pdf (31kb- PDF) pdf (223kb- PDF)  
  Patient Bay-Critical pdf (32kb- PDF) pdf (249kb- PDF)  
  Plaster Room pdf (32kb- PDF) pdf (237kb- PDF)  
  Property Bay-Staff pdf (25kb- PDF) pdf (161kb- PDF)  
R Reception pdf (28kb- PDF) pdf (187kb- PDF)  
S Scrub-Up/Gowning pdf (30kb- PDF) pdf (190kb- PDF)  
  Seclusion Room pdf (29kb- PDF) pdf (175kb- PDF)  
  Shower-Patient pdf (31kb- PDF) pdf (188kb- PDF)  
  Shower-Staff pdf (28kb- PDF) pdf (150kb- PDF)  
  Staff Room pdf (31kb- PDF) pdf (205kb- PDF)  
  Staff Station pdf (29kb- PDF) pdf (202kb- PDF) film (42 kb, JPG)
  Store-Cleaner's pdf (27kb- PDF) pdf (160kb- PDF)  
  Store-Equipment pdf (28kb- PDF) pdf (167kb- PDF)  
  Store-Files pdf (26kb- PDF) pdf (183kb- PDF)  
  Store-General pdf (26kb- PDF) pdf (149kb- PDF)  
  Store-Photocopy/Stationery pdf (28kb- PDF) pdf (166kb- PDF)  
  Store-Sterile Stock pdf (28kb- PDF) pdf (176kb- PDF)  
    (RDS) (RLS) Picture
T Toilet-Disabled pdf (31kb- PDF) pdf (170kb- PDF)  
  Toilet-Patient pdf (31kb- PDF) pdf (170kb- PDF)  
  Toilet-Public (3 & 4 m2) pdf (29kb- PDF) pdf (302kb- PDF)  
  Toilet-Staff pdf (28kb- PDF) pdf (152kb- PDF)  
  Treatment Room pdf (31kb- PDF) pdf (223kb- PDF)  
U Ultra-Isolation Floor Plan   pdf (170kb- PDF)  
  Ultra-Isolation Airlock (for Autoclave) pdf (29kb- PDF) pdf (170kb- PDF)  
  Ultra-Isolation Airlock Entry pdf (28kb- PDF) pdf (218kb- PDF)  
  Ultra-Isolation Clean Utility (same RLS as above) pdf (28kb- PDF) pdf (218kb- PDF)  
  Ultra-Isolation Dirty Utility pdf (31kb- PDF) pdf (198kb- PDF)  
  Ultra-Isolation Ensuite pdf (31kb- PDF) pdf (209kb- PDF)  
  Ultra-Isolation Patient Bed Room pdf (32kb- PDF) pdf (249kb- PDF)  
  Ultra-Isolation Staff Change pdf (31kb- PDF) pdf (192kb- PDF)  
W Waiting pdf (28kb- PDF) pdf (168kb- PDF)  
X X-Ray Viewing and Reporting pdf (28kb- PDF) pdf (206kb- PDF)  

redarrowup top of index



 
For information relating to this page contact: Randall Garnham email:design.guidelines@dhs.vic.gov.au
Site authorised by: Manager, Strategic Asset Planning

Last Updated: 15 September, 2008
© Copyright State of Victoria | Disclaimer | Privacy statement | State Government of Victoria home | Search DHS | Download help